Electrical safety in the private rented sector
Contents |
[edit] Introduction
All tenants deserve to live in homes which are safe, notably from risks such as fire or electrocution. To protect tenants, ECA, Electrical Safety First and other partners pressed the Government for a sustained period to introduce legislation. As a result of this, the Government recently introduced new regulations to improve electrical safety in the rented sector.
As of 1st June 2020, the ‘Electrical Safety in the Private Rented Sector (England) Regulations 2020’ has been in force utilising the powers set out in the Housing and Planning Act 2016. It also makes amendments to the ‘Management of Houses in Multiple Occupation (England) Regulations 2006’.
These Regulations apply in England only to all new specified tenancies from 1st July 2020, and all existing specified tenancies from 1st April 2021.
[edit] Regulations in the devolved nations
Landlords in Wales are subject to different regulations under the Building Regulations 2010, the Electrical Equipment (Safety) Regulations 1994 and the Renting Homes (Wales) act 2016.
Northern Ireland has no laws that specifically cover electrical safety in privately rented accommodation, however properties must be fit for human habitation. Northern Ireland Electricity can disconnect the electrical supply if it believes that the electricity at a property is unsafe.
Private landlords in Scotland are required by law (Housing (Scotland) Act 2006) to ensure that their properties are electrically safe.
[edit] Safe electrical installations
This new statutory requirement places a greater emphasis on the private landlord to ensure that their electrical installations are fit for use. The Regulations make it mandatory in most cases for private landlords to have regular and valid electrical installation condition reports (EICR) undertaken in their properties at intervals of no more than five years and for this inspection to be carried out by a qualified person.
Any dangerous situations that require urgent remedial action (C1, C2 or FI) noted on the EICR should be rectified within 28 days. Failure to comply with these Regulations carries significant financial penalties.
Landlords must take their responsibilities seriously or face the consequences. Landlords will however also benefit from these regulations by knowing that their properties are electrically sound, protecting their investments.
Landlords should therefore choose those who are to carry out these electrical condition reports with care and check their qualifications.
For further general guidance, see the MHCLG website.
This article was originally published on the ECA website on 1 June 2020. It was written by Mike Smith, ECA technical director.
--ECA
[edit] Related articles on Designing Buildings
- 2021 PRS electrical safety standards.
- Articles about electricity.
- Articles by the Electrical Contractors' Association (ECA).
- Converting commercial offices to residential accommodation.
- Homes (Fitness for Human Habitation) Act 2018.
- Landlord
- Electrical safety.
- Electrical test equipment for use on low voltage electrical systems GS38.
- Property disrepair and landlord liabilities.
- Safety.
- Tenant.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February